The Archive

Every report in the Power Gap Report.

Issue 05

The Speed To Power Imperative

Navigating interconnection delays for commercial & industrial expansions.

C&I6 min read
Issue 03

The 18-Month Slip

Protecting the construction critical path through bridge power.

Construction7 min read
Issue 01

The Equipment-Interconnection Gap

Navigating the 36-month dead zone in data center deployment.

Data Centers9 min read
Dispatch · July 24, 2026

San Antonio Gas-Power Lawsuit Puts Off-Grid Data Center Timelines Under the Microscope

A legal challenge against on-site gas generation for a Texas AI campus shows how permitting risk, not just interconnection queues, can leave finished data center buildings without power for months.

Data Centers6 min read
Issue 04

Closing The Energization Gap

A strategic power framework for remote mine operations.

Mining7 min read
Issue 02

The Interconnection Illusion

Solving the electrification gap in fixed field infrastructure.

Oil & Gas8 min read
Issue 06

The Gap Year

The 12–36 months of dead time between when power is needed and when the grid can deliver it.

Flagship11 min read