The Grid Is Late.
Your Schedule Isn’t.

Schedule Protection · Lead-Time Intelligence

160+ Wks Large-Power Transformers

Sold Thru 2028 MV Switchgear

12–36 Mo Of Dead Time — Bounded, Not Stranded

160+weeks Large-Power TransformersOrder-to-delivery lead time
2028sold through Medium-Voltage SwitchgearEffective availability horizon
~5years Heavy-Frame TurbinesUp to 7 years for new orders
~107weeks Reciprocating GensetsCat 3600 family

2026 market lead times · sources cited in each report · the gap is dead time to be bridged — not a permanent barrier

About the report

Independent Reading.
Disclosed Publisher.

The Power Gap Report tracks the widening space between electricity demand and the grid’s capacity to deliver it — as sourced lead-time data, not opinion.

Every figure we publish is real and traceable to a cited source. We frame the gap the way the data supports it: 12–36 months of dead time on a project schedule — bounded and plannable, never permanent stranding. If you build or operate large electrical loads, the report exists so the gap never surprises your schedule.

The Power Gap Report is published by 2G Energy Rental. The affiliation is disclosed plainly and never leads the coverage — the reporting stands on its sources.

As published on LinkedInEvery figure traceable to a cited sourceRead by GCs, ECs & developers